Dynamic Project Intervention: Engineering Rigor & On-Site Compensation.
"3+1" Protocol: The Immutable Foundation.
Every ODM order is governed by the "3+1" core documentation: Quote, Contract, Technical Drawings, and Service Agreement. Once confirmed, production proceeds strictly according to these irreversible parameters.
Pre-Shipment Correction: Halting & Re-Assessment.
If a site error is reported before shipment, we immediately halt production to assess the impact.
· Impact Analysis: We evaluate the additional costs and lead-time delays caused by the change.
· Feasibility: If the change exceeds the limits of the current workpiece, the original component may be scrapped, and a re-production will be required. This underscores why your final sign-off on the "3+1" files is critical.
Post-Arrival Strategy: Adaptability & Product Autonomy.
For discrepancies identified after dispatch, the solution shifts to "Site-First, Product-Guided" adaptation:
· On-Site Coordination: We first evaluate if site dimensions or installation methods can be adjusted to match the precision-built product.
· Built-in Tolerance: Many of our systems include a pre-designed adjustment range (e.g., ±1cm wall thickness tolerance for specific door sets) to absorb minor site variances.
· Architectural Adaptability: Our "No-Casing" series or specific window designs are naturally adaptable to varying wall thicknesses, allowing for successful installation even if site conditions shift.